Electric Geyser Inner Tank Production Line - Sand Blasting Machine

Transmission Type: Flexible
Automatic Production Line: Comprehensive
Certification: ISO
Automation: Automation
Flexible Production: Lean Production
Rhythm: Flow Production Line
Gold Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Sand Blasting Machine
Production Scope
Parts Production Line
Condition
New
Type
Fully Automatic, Semi Automatic
Voltage
220V/380V
Color
Customized
After-Sales Service Provided
Engineers Available to Service Machinery Overseas
Transport Package
Wooden Box or Nude Package
Trademark
GETWELD
Origin
China
Production Capacity
1000pieces/Year

Product Description

Electric Geyser Inner Tank Production Line - Sand Blasting Machine

Product Parameters
1. Sandblasting cabinet: frame is made of structural steel. Wall is made of steel sheet. Rubber sheets are adhered to the inside of walls and roof.
2. Sand blasting machine: consists of sand blasting machine, sand blasting pipe, sand blasting nozzle.
3. Sand recycling system
4. Spraying gun moving mechanism
5. Control system

Inner Tank Production Flow
Decoiling and straightening-- cutting to length-- rolling-- straight seam welding-- flaring-- assembly-- girth welding-- mounting plate welding-- T month repair welding-- leakage testing-- sandblasting-- sweeping-- enamel coating-- drying-- sintering

1. Washing line for electric geyser inner tank production line
Technical Parameters:
Workpiece material: CRC
Workpiece size: Cap diameter < 420mm; Sheet width< 1400mm
Workpiece weight:<20KG
Technique speed: V=4.0 m/min(0.6~6.0m/min Changeable)
Conveyor type: Horizontal SS net chain conveyor
Capacity: Cap 1000pcs/8Hr""
Manpower needed: 1
Guarantee period: 1 year  Electric Geyser Inner Tank Production Line - Sand Blasting Machine


2. Rolling machine for electric geyser inner tank production line
Technical Parameters:
Rolling Open:0~+15mm;
front and back offset after rolling:<2mm/m;
low and rise offset after rolling:<±5mm;
rolling straight edge:<10mm;
after rolling the max and min dia tolerance:≤6mm;
Manpower needed: 1
Guarantee period: 1 year
Electric Geyser Inner Tank Production Line - Sand Blasting Machine 
             
3. Straight seam welding machine for electric geyser inner tank production line
Welding technology is one side welding and two sides forming, welding speed is ≥800mm/min
Welding air: Ar/100%;
Welding Protect Air:Ar/100% or AR/95%+H2/5%
Protect Air:Ar/100%(back side protect )
Manpower needed: 1
Guarantee period: 1 year
Electric Geyser Inner Tank Production Line - Sand Blasting Machine 

4. Flaring machine for electric geyser inner tank production line
Technical Parameters:
Barrel length: 280-1400MM
Max. sheet thickness: CRC=2.5MM; Stainless Steel=2.0MM
Min. barrel diameter: 280MM
Max. barrel diameter: 450MM
Manpower needed: 1
Guarantee period: 1 year
Electric Geyser Inner Tank Production Line - Sand Blasting Machine        


5. Assemble line for electric geyser inner tank production line
Technical Parameters:
Spindle motor speed: 30 r/min
Spindle motor power: 3 KW
Hydraulic motor power: 15 KW
Hydraulic system pressure: 7 MPa
Pneumatic system working pressure: 0.7 MPa
Barrel diameter range: Φ300~Φ450 mm
Barrel length range: 280~1150 mm
One assembly circle period: 20 seconds
Manpower needed: 1
Guarantee period: 1 year
 Electric Geyser Inner Tank Production Line - Sand Blasting Machine          


6. Circumferential seam welding machine for electric geyser inner tank production line
Welding way: MAG
Welding Method: two welder overlap welding, fixed welder, products rotating; seam welding tracking system, tracking the welding quality
Protection: partial protect, protect arc light,
Loading and unloading: automatic loading, mechanical hand air transplant unloading.
Manpower needed: 1
Guarantee period: 1 year
Electric Geyser Inner Tank Production Line - Sand Blasting Machine         


7. Inner tank leakage testing machine for electric geyser production
Inner Tank Capacity: 10-100L;
Inner Tank Dia.: Φ280-Φ400;
Inner Tank Length: 324-1003mm;
Inner Tank Thickness: 0.8mm;
Production Capacity: 40S/Pc
Electric Power Requirements: 3 Phase 380V / 50Hz;1 Phase 220V / 50Hz;
Max. Power: 200W
Max. Gas Consumption: 1250L/Min
Machine Overall Dimension: 2950mmX900mmX2420mm
Basin Dimension: 2000mmX800mmX800mm
Manpower needed: 1
Electric Geyser Inner Tank Production Line - Sand Blasting Machine             


8. Sand blasting machine for electric geyser inner tank production line
1. Sandblasting cabinet: frame is made of structural steel. Wall is made of steel sheet. Rubber sheets are adhered to the inside of walls and roof.
2. Sand blasting machine: consists of sand blasting machine, sand blasting pipe, sand blasting nozzle.
3. Sand recycling system
4. Spraying gun moving mechanism
5. Control system
Electric Geyser Inner Tank Production Line - Sand Blasting Machine


9.  Enameling line for electric geyser inner tank production line
1. Mainly used for hanging sintering. Max. size of inner tank: Ф410mm, height: 1400mm
2. Max. weight born by single hanger: 60Kg
3. Heat source: natural gas. Reference: 8500kcal/m3
4. Sintering capacity: more than 1500kg per hour (hangers included ).That is more than 60 pcs/hour.
5.Temperature ranges: 700ºC~900ºC; it takes less than 90 minutes for a cold furnace to reach 850ºC.
 Electric Geyser Inner Tank Production Line - Sand Blasting Machine  


10.  Drying furnace and sintering chamber for electric geyser production line
1. Chains inside the drying furnace is with length of 40m. It takes about 50-60 minutes for the drying.
2.Heat source for drying: adopting the 120ºC hot air which is from heat exchanger.
3. Chain speed: 0.5m~5m/min. Adjustable.
4. Sintering capacity: more than 60 pcs/h.
5. Sintering furnace is designed with heating temperature of 900ºC.
Electric Geyser Inner Tank Production Line - Sand Blasting Machine         


11.  Foaming line for electric geyser production line
Plat-chain dimension(L×B×H):650×100×2
Injection tank length: below 1700mm
Injection tank diameter: about φ600
Material that injected: POL+ISO(CFC11 or HCFC141b)and could meet water technology foaming.
Environment temperature of the running of foaming line: 22ºC~30ºC
Temperature of foaming material: 24ºC±3ºC
Manpower needed: 1
Guarantee period: 1 year
Electric Geyser Inner Tank Production Line - Sand Blasting Machine            


Our Service
* One year free warranty. 
* Follow-up project automation upgrading. 
* Technical support.
* Be customized according to client's requirments.

FAQ

Q: Can your machine be customized ?
A: Yes, we are a professional manufacturer specialized in automatic welding 
equipment more than 25 years, we have a strong design & technical team, 
we can design and manufacture as your requirements. 

Q: How to get an accurate quotation ?
A: Please provide us the detail of the workpiece such as drawings or daily out put

Q: What's the shipping cost from China to your country ?
A: We can send machine to your port by sea . Customers specify freight forwarders or negotiable shipping methods.

Q: Payment terms, MOQ, warranty, FOB...
A: Payment terms: 30% down payment against order 
Minimum order quantity: 1 set
Delivery time: 2-4 months after receipt of formal order 
Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc. You can contact us any time.


 

 

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now