Electric Water Boiler Assembly Machine

Product Details
Condition: New
Automation: Automation
Function: Assembly Machine for Water Heater Tank Manufacturi
Manufacturer/Factory, Trading Company
Gold Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Export Year
2006-07-13
  • Electric Water Boiler Assembly Machine
  • Electric Water Boiler Assembly Machine
  • Electric Water Boiler Assembly Machine
Find Similar Products

Basic Info.

Model NO.
Assembly Machine
Type
Fully Automatic, Semi Automatic
Voltage
220V/380V
Warranty
1 Year
After-Sales Service Provided
Engineers Available to Service Machinery Overseas
Transmission Type
Flexible
Automatic Production Line
Assembly
Certification
CE, ISO
Flexible Production
Lean Production
Rhythm
Flow Production Line
Production Scope
Parts Production Line
Transport Package
Standard Package
Trademark
GETWELD
Origin
China
Production Capacity
1000pieces/Year

Product Description

Electric Water Boiler Assembly Machine

Product Parameters
Spindle motor speed: 30 r/min
Spindle motor power: 3 KW
Hydraulic motor power: 15 KW
Hydraulic system pressure: 7 MPa
Pneumatic system working pressure: 0.7 MPa
Barrel diameter range: Φ300~Φ450 mm
Barrel length range: 280~1150 mm
One assembly circle period: 20 seconds
Manpower needed: 1
Guarantee period: 1 year

Electric Water Boiler Inner Tank Production Flow
Decoiling and straightening-- cutting to length-- rolling-- straight seam welding-- flaring-- assembly-- girth welding-- mounting plate welding-- T month repair welding-- leakage testing-- sandblasting-- sweeping-- enamel coating-- drying-- sintering

1. Washing line for electric water boiler production line
Technical Parameters:
Workpiece material: CRC
Workpiece size: Cap diameter < 420mm; Sheet width< 1400mm
Workpiece weight:<20KG
Technique speed: V=4.0 m/min(0.6~6.0m/min Changeable)
Conveyor type: Horizontal SS net chain conveyor
Capacity: Cap 1000pcs/8Hr""
Manpower needed: 1
Guarantee period: 1 year  Electric Water Boiler Assembly Machine


2. Rolling machine for electric water boiler production line
Technical Parameters:
Rolling Open:0~+15mm;
front and back offset after rolling:<2mm/m;
low and rise offset after rolling:<±5mm;
rolling straight edge:<10mm;
after rolling the max and min dia tolerance:≤6mm;
Manpower needed: 1
Guarantee period: 1 year
Electric Water Boiler Assembly Machine 
             
3. Straight seam welding machine for electric water boiler production line
Welding technology is one side welding and two sides forming, welding speed is ≥800mm/min
Welding air: Ar/100%;
Welding Protect Air:Ar/100% or AR/95%+H2/5%
Protect Air:Ar/100%(back side protect )
Manpower needed: 1
Guarantee period: 1 year
Electric Water Boiler Assembly Machine 

4. Flaring machine for electric water boiler production line
Technical Parameters:
Barrel length: 280-1400MM
Max. sheet thickness: CRC=2.5MM; Stainless Steel=2.0MM
Min. barrel diameter: 280MM
Max. barrel diameter: 450MM
Manpower needed: 1
Guarantee period: 1 year
Electric Water Boiler Assembly Machine        


5. Assemble line for electric water boiler production line
Technical Parameters:
Spindle motor speed: 30 r/min
Spindle motor power: 3 KW
Hydraulic motor power: 15 KW
Hydraulic system pressure: 7 MPa
Pneumatic system working pressure: 0.7 MPa
Barrel diameter range: Φ300~Φ450 mm
Barrel length range: 280~1150 mm
One assembly circle period: 20 seconds
Manpower needed: 1
Guarantee period: 1 year
 Electric Water Boiler Assembly Machine          


6. Circumferential seam welding machine for electric water boiler production line
Welding way: MAG
Welding Method: two welder overlap welding, fixed welder, products rotating; seam welding tracking system, tracking the welding quality
Protection: partial protect, protect arc light,
Loading and unloading: automatic loading, mechanical hand air transplant unloading.
Manpower needed: 1
Guarantee period: 1 year
Electric Water Boiler Assembly Machine         


7. Inner tank leakage testing machine for electric water boiler production
Inner Tank Capacity: 10-100L;
Inner Tank Dia.: Φ280-Φ400;
Inner Tank Length: 324-1003mm;
Inner Tank Thickness: 0.8mm;
Production Capacity: 40S/Pc
Electric Power Requirements: 3 Phase 380V / 50Hz;1 Phase 220V / 50Hz;
Max. Power: 200W
Max. Gas Consumption: 1250L/Min
Machine Overall Dimension: 2950mmX900mmX2420mm
Basin Dimension: 2000mmX800mmX800mm
Manpower needed: 1
Electric Water Boiler Assembly Machine             


8. Sand blasting machine for electric water boiler production line
1. Sandblasting cabinet: frame is made of structural steel. Wall is made of steel sheet. Rubber sheets are adhered to the inside of walls and roof.
2. Sand blasting machine: consists of sand blasting machine, sand blasting pipe, sand blasting nozzle.
3. Sand recycling system
4. Spraying gun moving mechanism
5. Control system
Electric Water Boiler Assembly Machine


9.  Enameling line for electric water boiler production line
1. Mainly used for hanging sintering. Max. size of inner tank: Ф410mm, height: 1400mm
2. Max. weight born by single hanger: 60Kg
3. Heat source: natural gas. Reference: 8500kcal/m3
4. Sintering capacity: more than 1500kg per hour (hangers included ).That is more than 60 pcs/hour.
5.Temperature ranges: 700ºC~900ºC; it takes less than 90 minutes for a cold furnace to reach 850ºC.
 Electric Water Boiler Assembly Machine  


10.  Drying furnace and sintering chamber for electric water boiler production line
1. Chains inside the drying furnace is with length of 40m. It takes about 50-60 minutes for the drying.
2.Heat source for drying: adopting the 120ºC hot air which is from heat exchanger.
3. Chain speed: 0.5m~5m/min. Adjustable.
4. Sintering capacity: more than 60 pcs/h.
5. Sintering furnace is designed with heating temperature of 900ºC.
Electric Water Boiler Assembly Machine         


11.  Foaming line for electric water boiler production line
Plat-chain dimension(L×B×H):650×100×2
Injection tank length: below 1700mm
Injection tank diameter: about φ600
Material that injected: POL+ISO(CFC11 or HCFC141b)and could meet water technology foaming.
Environment temperature of the running of foaming line: 22ºC~30ºC
Temperature of foaming material: 24ºC±3ºC
Manpower needed: 1
Guarantee period: 1 year
Electric Water Boiler Assembly Machine            


Our Service
* One year free warranty. 
* Follow-up project automation upgrading. 
* Technical support.
* Be customized according to client's requirments.

FAQ

Q: Can your machine be customized ?
A: Yes, we are a professional manufacturer specialized in automatic welding 
equipment more than 25 years, we have a strong design & technical team, 
we can design and manufacture as your requirements. 

Q: How to get an accurate quotation ?
A: Please provide us the detail of the workpiece such as drawings or daily out put

Q: What's the shipping cost from China to your country ?
A: We can send machine to your port by sea . Customers specify freight forwarders or negotiable shipping methods.

Q: Payment terms, MOQ, warranty, FOB...
A: Payment terms: 30% down payment against order 
Minimum order quantity: 1 set
Delivery time: 2-4 months after receipt of formal order 
Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc. You can contact us any time.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier