Steel Drums/Barrels Automatic Washing and Drying Room Production

Product Details
Automation: Automatic, Automation
After-sales Service: Engineers Available to Service Machinery Oversea
Application: Dairy Products, Oil
Manufacturer/Factory, Trading Company
Gold Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Export Year
2006-07-13
  • Steel Drums/Barrels Automatic Washing and Drying Room Production
  • Steel Drums/Barrels Automatic Washing and Drying Room Production
  • Steel Drums/Barrels Automatic Washing and Drying Room Production
  • Steel Drums/Barrels Automatic Washing and Drying Room Production
Find Similar Products

Basic Info.

Model NO.
steel drum washing/cleaning and drying room
Driven Type
Hydraulic
Function
Making Steel Drum or Barrel
Mode of Operation
Special Product Packaging
After-Sales Service Provided
Engineers Available to Service Machinery Overseas
Transmission Type
Flexible
Automatic Production Line
Comprehensive
Certification
ISO, CE
Flexible Production
Lean Production
Rhythm
Flow Production Line
Production Scope
Product Line
Warranty
1 Year
Transport Package
Carton
Specification
220L
Trademark
Getweld
Origin
China
Production Capacity
5-10PCS/Min.

Product Description

Steel Drums/Barrels Production Line Automatic Washing and Drying Room
(1) Rain spray channel: please read the form of wash equipment technology processes;
(2) Wash transportation
Length: 42.25m
Type:   The drums transported go ahead and rotated itself
Speed:  0.5-4m/min.
Motor:  Electric-mange. no step/class to adjust speed;
Material:Chain---304 stainless steel or others;
Wheel shaft---2Cr13 stainless steel;
Wheel---casting iron;
Rail---304 stainless steel;
(3) Drying channel:
Demission: L8M; W1.5M; H1.7M
Heating way: Burning oil to be heated (made in Italy)
Oil consumes: 30kg/h
Work temperature: Room temperature to 120 ºC
(4) Drying transportation:
Length::34m
Type:the same as wash line;
Speed:0.5-4m/min.
Motor: Electr.-magn. No step/class to adjust speed;
Material: Chain---carbon steel or others;
Wheel shaft--- carbon steel;
Wheel---casting iron;
Rail--- carbon steel;
Channel liquid heating system: steam heating (steam temperature more than 100 ºC)
(5) Turning machine
Use purpose: After drums clean, to put the drums on the painting transport chain that position is from horizontal to vertical;
(6) Control box:1 set (to control the channel liquid temperature, transport speed, liquid supply in the wash line)

 
 

Production Process
Steel Drums/Barrels Automatic Washing and Drying Room Production
 
Steel Drums/Barrels Automatic Washing and Drying Room Production
1.Shearing section for drum body , drum cover and drum bottom production line:
Use the lifting equipment to put the steel coil on   de-coil machine 7 roller leveler machine accumulator measurement facility cutter transporter stow stand. Need one person to operate.
 
 
Steel Drums/Barrels Automatic Washing and Drying Room Production
2.Drums cover and bottom production line:
To forming the cover and bottom
To produce the infusing oil hole and ventilating hole for drumPre-curl spray glue machine
Before seaming, the drum top and bottom need pre-curl, at same time must spray glue to ensure the seaming quality.


 
Steel Drums/Barrels Automatic Washing and Drying Room Production
3.Drum body forming process
 Auto-feeding machine 
 Auto-welding machine:
 Extrusion flange and Beading machine:
Corrugating machine
Seaming machine
Leakage testing machine

 

Steel Drums/Barrels Automatic Washing and Drying Room Production
4.Washing line
Rain spray channel
Wash transportation
Drying channel
DRYING TRANSPORTATION
Turning machine
Control box
 
Steel Drums/Barrels Automatic Washing and Drying Room Production
5.Painting equipments,Vertical steel drums with 2 channel drying and solidify equipment
 


 
 
FAQ
Q: How do you ensure quality? 
A: we have a strong design & technical team, Our team ensures the production process at every stage and our QC will inspect each procedure as well.  we can design and manufacture as your requirements. 

 

Q: How to get an accurate quotation ?
A: Please provide us the detail of the workpiece such as drawings or daily out put

Q: What's the shipping cost from China to your country ?
A: We can send machine to your port by sea . Customers specify freight forwarders or negotiable shipping methods.

Q: Payment terms, MOQ, warranty, FOB...
A: Payment terms: 30% down payment against order 
     Delivery time: 3 months after receipt of formal order 
     Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc. You can contact us any time.















 





































 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier