Steel Drums/Barrels Production Line Automatic Washing and Drying Room
(1) Rain spray channel: please read the form of wash equipment technology processes;
(2) Wash transportation
Length: 42.25m
Type: The drums transported go ahead and rotated itself
Speed: 0.5-4m/min.
Motor: Electric-mange. no step/class to adjust speed;
Material:Chain---304 stainless steel or others;
Wheel shaft---2Cr13 stainless steel;
Wheel---casting iron;
Rail---304 stainless steel;
(3) Drying channel:
Demission: L8M; W1.5M; H1.7M
Heating way: Burning oil to be heated (made in Italy)
Oil consumes: 30kg/h
Work temperature: Room temperature to 120 ºC
(4) Drying transportation:
Length::34m
Type:the same as wash line;
Speed:0.5-4m/min.
Motor: Electr.-magn. No step/class to adjust speed;
Material: Chain---carbon steel or others;
Wheel shaft--- carbon steel;
Wheel---casting iron;
Rail--- carbon steel;
Channel liquid heating system: steam heating (steam temperature more than 100 ºC)
(5) Turning machine
Use purpose: After drums clean, to put the drums on the painting transport chain that position is from horizontal to vertical;
(6) Control box:1 set (to control the channel liquid temperature, transport speed, liquid supply in the wash line)
Production Process
1.Shearing section for drum body , drum cover and drum bottom production line:
Use the lifting equipment to put the steel coil on de-coil machine→ 7 roller leveler machine→ accumulator→ measurement facility→ cutter→ transporter→ stow stand. Need one person to operate.
2.Drums cover and bottom production line:
To forming the cover and bottom
To produce the infusing oil hole and ventilating hole for drumPre-curl spray glue machine
Before seaming, the drum top and bottom need pre-curl, at same time must spray glue to ensure the seaming quality.
3.Drum body forming process
Auto-feeding machine
Auto-welding machine:
Extrusion flange and Beading machine:
Corrugating machine
Seaming machine
Leakage testing machine
4.Washing line
Rain spray channel
Wash transportation
Drying channel
DRYING TRANSPORTATION
Turning machine
Control box
5.Painting equipments,Vertical steel drums with 2 channel drying and solidify equipment
FAQ
Q: How do you ensure quality?
A: we have a strong design & technical team, Our team ensures the production process at every stage and our QC will inspect each procedure as well. we can design and manufacture as your requirements.
Q: How to get an accurate quotation ?
A: Please provide us the detail of the workpiece such as drawings or daily out put
Q: What's the shipping cost from China to your country ?
A: We can send machine to your port by sea . Customers specify freight forwarders or negotiable shipping methods.
Q: Payment terms, MOQ, warranty, FOB...
A: Payment terms: 30% down payment against order
Delivery time: 3 months after receipt of formal order
Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc. You can contact us any time.