Rear Section Quipment for Steel Drum Production Line
1.Washing line
(1) Rain spray channel: please read the form of wash equipment technology processes;
(2) Wash transportation
Length: 42.25m
Type: The drums transported go ahead and rotated itself
Speed: 0.5-4m/min.
Motor: Electric-mange. no step/class to adjust speed;
Material:Chain---304 stainless steel or others;
Wheel shaft---2Cr13 stainless steel;
Wheel---casting iron;
Rail---304 stainless steel;
(3) Drying channel:
Demission: L8M; W1.5M; H1.7M
Heating way: Burning oil to be heated (made in Italy)
Oil consumes: 30kg/h
Work temperature: Room temperature to 120 ºC
(4) DRYING TRANSPORTATION:
Length::34m
Type:the same as wash line;
Speed:0.5-4m/min.
Motor: Electr.-magn. No step/class to adjust speed;
Material: Chain---carbon steel or others;
Wheel shaft--- carbon steel;
Wheel---casting iron;
Rail--- carbon steel;
Channel liquid heating system: steam heating (steam temperature more than 100 ºC)
(5) Turning machine
Use purpose: After drums clean, to put the drums on the painting transport chain that position is from horizontal to vertical;
(6) Control box:1 set (to control the channel liquid temperature, transport speed, liquid supply in the wash line)
2.Painting equipments:
(1) Painting room
Size: L2200mm; W4000mm; H2400mm;
Clean way: drying and water running;
Material: to dry is stainless steel plate, others is carbon steel plate;
Painting; inner is water proof paint material;
out is acid alcohol magnetic paint
Vertical 3 wheel turning machine: 2 sets;
Out paint transport chain:1 set; L7000m;
Paint machine: 3 sets, made in China;
Paint gun: 14 sets, made in China;
Paint heater: 2 sets, made in USA;
(2) Paint type: drums vertical;
(3) Out paint color and colors ribbon:
A,Color: The drum cover, bottom, two-end of drum body is in one color;
Middle of the drum body is in one color.
B,Colors ribbon: Two colors connect side is clean, and mixture side is less than ±1mm, paint fog spot is allowed but out of 1000mm with un-visible.
(4) PLC control box: 1 set; ( to control the paint and transport)
3. Vertical steel drums with 2 channel drying and solidify equipment:
(1) Drying channel:
Size: L24M; W2.2M; H2.1M;
Heat method:burning oil to heat;
Heat machine unit:2 sets (main part is made in Italy);
Oil consume:80L/h (2 sets)Max;
Work temperature:room temperature to 200ºC, and can be continue to be adjustable;
Temperature control precision: ±5 ºC (action precision);
Rising temperature time:≤20min.(When room 20 ºC)
Heat preservation property:when 200ºC in the channel, the surface rising temperature less than 10ºC (local part less than 15ºC);
(2)Drying transport:
Chain: 216A double pitch roller chain;
Transport row: 3 rows
Transport chain length: 34m
Transport speed: 0.4-2.5m/min.
Drying distributor in line: 1 set;
Drying distributor out line: 1 set;
Steel drums out line transport: 1 set(20m);
Drying type: Vertical;
(3) Control box:
Use purpose: To control; the temperature of drying channel and transport speed.
Quantity: 1 set;
4.Cooling equipment
FAQ
Q: How do you ensure quality?
A: we have a strong design & technical team, Our team ensures the production process at every stage and our QC will inspect each procedure as well. we can design and manufacture as your requirements.
Q: How to get an accurate quotation ?
A: Please provide us the detail of the workpiece such as drawings or daily out put
Q: What's the shipping cost from China to your country ?
A: We can send machine to your port by sea . Customers specify freight forwarders or negotiable shipping methods.
Q: Payment terms, MOQ, warranty, FOB...
A: Payment terms: 30% down payment against order
Delivery time: 3 months after receipt of formal order
Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc. You can contact us any time.
Digital controlled Uncoiling/ Flattening/Dislocation Pressing Line: