Hot Water Heaters Outer Tank Assembly Machine

Product Details
Transport Package: Nude Package or Carton
Manufacturer/Factory, Trading Company
Gold Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Export Year
2006-07-13
  • Hot Water Heaters Outer Tank Assembly Machine
  • Hot Water Heaters Outer Tank Assembly Machine
  • Hot Water Heaters Outer Tank Assembly Machine
  • Hot Water Heaters Outer Tank Assembly Machine
  • Hot Water Heaters Outer Tank Assembly Machine
  • Hot Water Heaters Outer Tank Assembly Machine
Find Similar Products

Basic Info.

Production Capacity
100

Product Description

Hot Water Heaters Outer Tank Assembly Machine

 

We can supply the manufacturing machines for the whole production line of solar water heater tank and electrical water heater geysers.

Loading Device  for solar /electric water heater outer tank production line

Productivity: 100pcs/Hour
Loading manipulator, turret press, discharging manipulator and 3-roll rolling machine are interlocked, automatically complete the actions of loading, punching, unloading and rolling in sequence.

     Loading manipulator and discharging manipulator are set with high capacity vacuum suction cup,photoelectric detection switch, magnetic separator, pushing device and Siemens PLC. Sheet size could be input, store and recall.

Hot Water Heaters Outer Tank Assembly Machine

Automatic Turrent Punching Machine for water heater outer tank production line
 

  • Three-axis linkage, digital control of independent two-dimensional coordinate motion.
  • Servo motor controlled precision screw driving and locking.
  • Actions of manual fast, slow moving and incremental movement can be performed simultaneously.
  • Absolute coordinate programming.
  • Screw backlash software compensation.
  • Using ISO international standard CNC code programming.
  • Editing functions such as calling, modifying, deleting, inserting, etc.
  • Dry run self-diagnosis, error program display.
  • Overcurrent, overvoltage, overheating, phase protection.
  • Breakpoint continues processing function.
  • The clamp protection function.

Hot Water Heaters Outer Tank Assembly Machine

Rolling Machine for  water heater outer tank production line

Three-roll rolling machine is used in parallel with turret punch press. After turret press, the sheet is loaded by manipulator. Photoelectric detects the working piece and send out the signal. First centering cylinder works, then pushing cylinder works. Rolling action completes. According to the process requirements, the storage function is set with the discharging platform, it is controlled by storage test switch. Servo motor drives side roller to controll the rolling Dia. , parameters are set by computer.

Hot Water Heaters Outer Tank Assembly Machine
 

 Water Tank After Rolling

Hot Water Heaters Outer Tank Assembly Machine
 

Bending and Lapping Machine for Water heater Outer Tanks

Main Parameters
Raw material: Filmed color coated steel sheet
Thickness: 0.4mm
Diameter of water tank: Φ290-Φ480mm
Length of water tank: 250-1200mm
Compressed air pressure 0.5-0.7MPa
Work efficiency: 2pcs/min.
Operator: 2 operators

 

Hot Water Heaters Outer Tank Assembly Machine

Electric Water HeaterTank After Lapped and Bended(Non-Welding Machine)

Hot Water Heaters Outer Tank Assembly Machine
 

Double Head Curling Machine for Water heater Outer Tanks

Main parameter:
Thickness: 0.4mm;
The double-headed curling machine work piece: Φ 310 ~ Φ 500 mm
production line processing barrel length: 200 ~ 1100mm;
The double-head edging machine can meet the requirements of 400 ~ 1100mm product processing.



Hot Water Heaters Outer Tank Assembly Machine

 After Flanged or Curled solar water heater outer tank production line
Hot Water Heaters Outer Tank Assembly Machine

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier