1.9 Shot blasting derusting machine
1)Equipment configuration: 1 set, including shot blasting chamber, shot blasting device, rotating roller and dust purification and recovery device (including first-class cyclone separation dust, second-class filter core dust), air duct and discharge chimney, etc.
2) cleaning efficiency: 120 /h;
3) projectile specification: loading amount is about 100-180kg;
4) projectile consumption: only 0.01kg/;
5) the number of toss: no less than 2, to ensure that there are no dead ends.
6) noise: the test value at 1 meters outside the isolation wall of the equipment should not exceed 85 dB.
7) Equipped with independent conveying chain and starting and stopping motor, front and rear equipped with automatic bottle feeder and automatic bottle feeder and conveying chain between them;
8) the maximum size is 5000 x 1500 x 2100 mm (long * width * height).
Technical requirements for dust purification and recovery unit
1) the handling capacity should be matched with the processing capacity of shot blasting machine, which can be larger than that of shot blasting machine.
2) Secondary dedusting should be adopted, which should consist of cyclone deduster, bag deduster, pulse back blow and impact equipment, electric control system, air duct, chimney, etc.
3) exhaust pipe (cylinder or chimney): height not less than 15m.
1.10 Fully automatic electrostatic spraying line
Electrostatic spraying pipeline drying channel adopts Bridge gas heating drying channel, the process temperature is about 160 ~ 220 ~C, automatic temperature control, digital display. The oven adopts the bridge type "U" shape, the outer plate thickness is not less than 1.0 mm galvanized steel sheet, the thickness of the insulation plate is not less than 120 mm, and the chamber insulation plate adopts the plug-in three-layer split-room structure. The air in the oven passes through the air pipe under the circulating fan, and the air enters the air pipe inside the oven after filtering and heating, so that the workpiece is evenly heated.
1.11 Air tightness tester
1) test pressure: 2.1MPa;
2) cylinder working pressure: 0.5~0.8Mpa;
3) air tight test rack: after entering the bottle, it is necessary to connect the fixture and bottle valve automatically for air tightness test.
4) the maximum length dimension of on-line air tightness testing machine should not exceed 7m.
1.12 Cylinder valve check stand
1) the number of seats on the check plate is 4.
2) air pressure for inspection: 2.1MPa;
3) the maximum size is 600 x 500 x 1100mm (long * width * height).
1.13 Printing machine
1) meet the requirements of monochrome printing; printing width: 600 x 400mm
2) work efficiency: more than 120 /h;
3) wire mesh and pneumatic switch
1.14-1.18 Chain conveyor line and drive system
The basic requirements of chain conveyor line include:
1) the conveyor line should meet the requirements of 12kg specification steel cylinder.
2) the conveying system should be convenient for the on-line and offline cylinders.
3) the length of the chain does not include the supporting chain.
5) main technical indicators:
A) roller conveyor speed: 0-6m/min (adjustable speed);
B) width of roller conveyor line: 420mm; height: 300~400mm;
C) the maximum single point lifting weight of the suspension chain line is not less than 50kg;
6) The conveying chain should be set in segments according to the requirements of automation, and the segments should be guaranteed to be independently controlled and operated. At the same time, it should be able to work simultaneously with the entire conveying line.
7) The chain for transporting standing cylinders should be provided with necessary guardrail, and the height of guardrail should ensure the safety of transporting cylinders.
Driving head and driving motor
1) drive mode: Electric;
2) adaptive power supply voltage / frequency: three phase 380V/50Hz
3) roller conveyor speed: 0-4m/min (adjustable speed);
4) The driving head and the driving motor shall be matched with the conveyor chain set up in sections according to the requirements of automation, and the starting and stopping of the operating process shall be ensured at any time without damaging the driving head and the motor.